In 1999 the operational time of 600kV Cockroft-Walton accelerator was 750h for nuclear physics experimentsand for its improvement and maintenance. These experiments are as follows.1. Study of nuclear reaction induced by low energy (【300keV) proton on TiDx target and the action ofhydrogen in Ti alloy