Numerical analysis on water-inrush process due to floor heave
基本信息来源于合作网站,原文需代理用户跳转至来源网站获取
摘要:
To investigate the water-inrush process due to floor heave, simulation model was made and factors of mining height, immediate roof strength, water pressure, depth and strength of confiningbed, excavation step distance and bury depth were analyzed by using UDEC software. Five zones theory (containing two maximum main stress circles and three maximum main stress stratiform zones) along excavation direction was proposed,and two-ends-fixed beam mechanical model in maximum main stress circle was established. It is found that water inrush always occurs at the end of the beam where shear stress is higher, that is to say, it always occurs at near the starting cut and working face.Water pressure, height and strength of confiningbed are the determined factors, and mining height, immediate roof strength, excavation step distance and bury depth effect water inrush process due to floor heave.