Mosul Dam is an earth fill dam located on the Tigris River in North Western part of Iraq. It is 113 m in height, 3.4 km in length, 10 m wide in its crest and has a storage capacity of 11.11 billion cubic meters. It is, constructed on bedrocks which consist of gypsum beds alternated with marl and limestone, in cyclic nature. The thickness of the gypsum beds attains 18 m;they are intensely karstified even in foundation rocks. This has created number of problems during construction, impounding and operation of the dam. Construction work in Mosul Dam started on January 25th, 1981 and started operating on 24th July, 1986. After impounding in 1986, seepage locations were recognized. The cause of seepage is mainly due to: 1) The karsts prevailing in the dam site and in the reservoir area. 2) The existence of gypsum/anhydrite rock formations in the dam foundation alternating with soft marl layers and weathered and cavernous limestone beddings. 3) The presence of an extensive ground water aquifer called Wadi Malleh aquifer, which affects considerably the ground water regime in the right bank. The dissolution intensity of the gypsum/anhydrite ranged from 42 to 80 t/day which was followed by a noticeable increase in the permeability and leakages through the foundation. Inspection of the dam situation in 2014 and 2015 indicates that the dam is in a state of extreme unprecedentedly high relative risk. In this work, possible solutions to the problem are to be discussed. It is believed that grouting operations will elongate the span life of the dam but do not solve the problem. Building another dam downstream Mosul Dam will be the best protective measures due to the possible failure of Mosul Dam, to secure the safety of the downstream area and its’ population.
推荐文章
磁处理器DAM防腐阻垢试验研究
磁处理
防腐阻垢
循环冷却水
DAM系列数字调幅中波广播发射机简介
量化bit数
功率模块
DAM系列
DAM 10 kW中波发射机B-电源电路分析
DAM 10 kW中波发射机
B-电源电路原理
故障分析与处理
内容分析
关键词云
关键词热度
相关文献总数  
(/次)
(/年)
文献信息
篇名 Is Mosul Dam the Most Dangerous Dam in the World? Review of Previous Work and Possible Solutions
来源期刊 工程(英文)(1947-3931) 学科 医学
关键词 Mosul DAM Tigris River DAM Failure KARSTIFICATION FLOODING Iraq
年,卷(期) gc-eng_2017,(10) 所属期刊栏目
研究方向 页码范围 801-823
页数 23页 分类号 R73
字数 语种
DOI
五维指标
传播情况
(/次)
(/年)
引文网络
引文网络
二级参考文献  (0)
共引文献  (0)
参考文献  (0)
节点文献
引证文献  (0)
同被引文献  (0)
二级引证文献  (0)
2017(0)
  • 参考文献(0)
  • 二级参考文献(0)
  • 引证文献(0)
  • 二级引证文献(0)
研究主题发展历程
节点文献
Mosul
DAM
Tigris
River
DAM
Failure
KARSTIFICATION
FLOODING
Iraq
研究起点
研究来源
研究分支
研究去脉
引文网络交叉学科
相关学者/机构
期刊影响力
工程(英文)(1947-3931)
月刊
1947-3931
武汉市江夏区汤逊湖北路38号光谷总部空间
出版文献量(篇)
367
总下载数(次)
1
论文1v1指导