The study was carried out exclusively in Ghana to explore the approaches employed by consultants in risk assessment at the design phase of projects in Ghana. One hundred and fourteen (114) consultants were selected out of a population of one hundred and eighty six (186) from three main professional associations in Ghana made up of the Ghana Institute of Architects, Ghana Institution of Engineers and the Ghana Institution of Surveyors (Quantity Surveying Division) practicing in Ghana for the study. Both primary and secondary data were collected. A descriptive survey was also used to observe and describe the presence, frequency or absence of characteristics of a phenomenon as it naturally occurred, in order to gain additional information. A questionnaire was also designed to collect data from the architects, engineers and quantity surveyors. The data was analyzed using Statistical Package for the Social Scientists (SPSS) 17.0. Descriptive and inferential statistics, such as frequency tables, percentages and cross tabulations were used in the data analysis and summaries. Simple tests of associations were undertaken by using Chi square and Cramer’s V statistics to compare relationships between variables. Again, relative importance index was also used to analyze some of the data by computing to deduce their rankings. The relative importance index was used to analyze some of the data by computing to deduce their rankings. The research revealed that majority of consultants had an average knowledge of risk management. Based on the findings it was recommended that consultants undergo advanced training in risk assessment. It was therefore suggested that consultancy firms should develop a set of laid down procedures for consultants to use in risk assessment in order that the use of intuition employed by majority is lessened. The challenges observed in risk assessment and the remedial steps suggested curtailing the detrimental effects of risks would be of wide importance to many developing economies.
推荐文章
Ecological risk assessment of surficial sediment by heavy metals from a submerged archaeology harbor
Heavy metals
Eastern harbor
Enrichment factors
Degree of contamination
Potential ecological risk
Mercury speciation, bioavailability and risk assessment on soil–rice systems from a watershed impact
Mercury and methylmercury
Rice
Mercury speciation and bioavailability
Paddy soil
Risk assessment
基于Advance PLD Design的PLD设计与仿真
可编程逻辑器件
Advance PLD Design
设计与仿真
内容分析
关键词云
关键词热度
相关文献总数  
(/次)
(/年)
文献信息
篇名 Risk Assessment at the Design Phase of Construction Projects in Ghana
来源期刊 房屋建造与规划研究(英文) 学科 医学
关键词 Construction INDUSTRY PROJECT RISK Management Assessment DESIGN PHASE
年,卷(期) 2019,(2) 所属期刊栏目
研究方向 页码范围 39-58
页数 20页 分类号 R73
字数 语种
DOI
五维指标
传播情况
(/次)
(/年)
引文网络
引文网络
二级参考文献  (0)
共引文献  (0)
参考文献  (0)
节点文献
引证文献  (0)
同被引文献  (0)
二级引证文献  (0)
2019(0)
  • 参考文献(0)
  • 二级参考文献(0)
  • 引证文献(0)
  • 二级引证文献(0)
研究主题发展历程
节点文献
Construction
INDUSTRY
PROJECT
RISK
Management
Assessment
DESIGN
PHASE
研究起点
研究来源
研究分支
研究去脉
引文网络交叉学科
相关学者/机构
期刊影响力
房屋建造与规划研究(英文)
季刊
2328-4889
武汉市江夏区汤逊湖北路38号光谷总部空间
出版文献量(篇)
127
总下载数(次)
0
总被引数(次)
0
论文1v1指导