基本信息来源于合作网站,原文需代理用户跳转至来源网站获取       
摘要:
The cutterhead system is a core component of TBM equipment,which works in the extremely severe environment,and the strong impact loads result in severe vibration,crack,damage failure and other engineering failures.Accordingly,the key for cutterhead system structure design and parameter matching is to evaluate and predict cutterhead tunneling per-formance reasonably.In this paper,a prediction method for TBM cutterhead dynamic tunneling performance is pro-posed under the typical composite geological conditions,based on the CSM model of multi-cutters and cutter loads field test data.Then an actual TBM cutterhead of a water conservancy project is taken as an example,a spatial three-dimensional separation zone model for cutterhead tunneling is established under the typical geological condition,and the parameters influence rules of cutterhead tunneling performance are analyzed.The results show that,the cutter-head loads and specific energy change rules with different parameters are basically similar.Moreover,under the condi-tion of penetration p=10mm,the cutterhead bending moment coefficient of variation magnitude exceeds 20%,which is the maximum,and the normal cutter spacing optimal value is 95mm.Also,when the normal cutter spacing is kept constant in 85mm,the penetration has a greater influence on the torque and specific energy coefficient of variations,which is increased from 2mm to 10mm,and the two indexes decrease by about 73%.It is indicated that proper increase of pene-tration is beneficial to reduce the vibration fluctuation degree of torque and specific energy.The proposed method of TBM cutterhead dynamic tunneling performance and the analysis results can provide theoretical basis and design refer-ence for TBM cutterhead layout and tunneling parameters matching.
推荐文章
Variations of trace elements under hydrological conditions in the Min River, Eastern Tibetan Plateau
Trace elements
Concentration-discharge relationship
Tibetan Plateau
River
Synthesis of zinc oxide–montmorillonite composite and its effect on the removal of aqueous lead ions
Synthesis
Characterization
Zinc oxide–montmorillonite composite
Adsorption, Pb2+ ions
内容分析
关键词云
关键词热度
相关文献总数  
(/次)
(/年)
文献信息
篇名 A Prediction Method for TBM Cutterhead Dynamic Tunneling Performance under Typical Composite Geological Conditions
来源期刊 机械工程(英文) 学科 交通运输
关键词 TBM cutterhead spatial GEOLOGICAL model TUNNELING PERFORMANCE PARAMETER influence
年,卷(期) 2019,(1) 所属期刊栏目
研究方向 页码范围 32-40
页数 9页 分类号 U45
字数 语种
DOI
五维指标
传播情况
(/次)
(/年)
引文网络
引文网络
二级参考文献  (0)
共引文献  (0)
参考文献  (0)
节点文献
引证文献  (0)
同被引文献  (0)
二级引证文献  (0)
2019(0)
  • 参考文献(0)
  • 二级参考文献(0)
  • 引证文献(0)
  • 二级引证文献(0)
研究主题发展历程
节点文献
TBM
cutterhead
spatial
GEOLOGICAL
model
TUNNELING
PERFORMANCE
PARAMETER
influence
研究起点
研究来源
研究分支
研究去脉
引文网络交叉学科
相关学者/机构
期刊影响力
机械工程(英文)
不定期
2661-4448
重庆市渝北区赛迪路2号金山商业中心A座
出版文献量(篇)
29
总下载数(次)
0
总被引数(次)
0
期刊文献
相关文献
推荐文献
论文1v1指导