基本信息来源于合作网站,原文需代理用户跳转至来源网站获取       
摘要:
The interconnection of Solar PV to the Tarkwa Bulk Supply Point (BSP) has become necessary in order to provide additional capacity to meet the ever-increasing demand of Tarkwa and its environs during the day. The Solar PV Plant will support the Tarkwa BSP during the day. In this study, a grid impact analysis for the integration of Solar PV plant at three points of common coupling (PCC) at Tarkwa Bulk Supply Point’s (BSP) 33 kV network of the Electricity Company of Ghana was carried out. The three PCCs were Tarkwa BSP, Ghana Australia Gold (GAG) Substation and Darmang Substation. Simulations and detailed analysis were carried out with the use of CYME Software (Cyme 8.0 Rev 05). The Solar PV was integrated at varying penetration levels of 9 MWp, 11 MWp, 14 MWp, 16 MWp, 18 MWp, 20 MWp and 23 MWp (representing penetration levels of 40%, 50%, 60%, 70%, 80%, 90% and 100%, respectively) of the 2020 projected light demand of Tarkwa BSP 25.15 MVA network at an average power factor of 0.903. From the study, the optimum capacity of Solar PV power that could be connected is 9 MWp at an optimum inverter power factor of 0.94 lagging, and the GAG Substation was identified as the optimal location. The stiffness ratio at the optimal location was determined as 41.9, a figure which is far greater than the minimum standard value of 5, and gives an indication of very little voltage control problems in the operation of the proposed Solar PV interconnection. The integration of the optimum 9 MW Solar PV Plant to the Tarkwa network represents an additional 12.77% capacity, decreased the technical losses by 7.76%, and increased the voltage profile by 1.97%.
推荐文章
Elemental characteristics and paleoenvironment reconstruction: a case study of the Triassic lacustri
Trace elements
Occurrence mode
Paleoenvironment
Zhangjiatan oil shale
Yanchang Formation
Ordos Basin
Optimizing the ratio of the spike to sample for isotope dilution analysis: a case study with seleniu
Isotope dilution method
Error propagation
Mento Carlo
Se concentration
Geological reference materials
Iron isotope fractionation during fenitization: a case study of carbonatite dykes from Bayan Obo, In
Iron isotopes
Fenitization
Fluid exsolution
Carbonatite
Bayan Obo
内容分析
关键词云
关键词热度
相关文献总数  
(/次)
(/年)
文献信息
篇名 Optimum Sizing and Siting of an Embedded Solar Photovoltaic Generation: A Case Study of 33 kv Sub-Transmission Network at Tarkwa, Ghana
来源期刊 电力能源(英文) 学科 工学
关键词 Grid Integration Embedded Solar PV Sub-Transmission Network Technical Losses
年,卷(期) 2021,(3) 所属期刊栏目
研究方向 页码范围 1-24
页数 24页 分类号 TP3
字数 语种
DOI
五维指标
传播情况
(/次)
(/年)
引文网络
引文网络
二级参考文献  (0)
共引文献  (0)
参考文献  (0)
节点文献
引证文献  (0)
同被引文献  (0)
二级引证文献  (0)
2021(0)
  • 参考文献(0)
  • 二级参考文献(0)
  • 引证文献(0)
  • 二级引证文献(0)
研究主题发展历程
节点文献
Grid
Integration
Embedded
Solar
PV
Sub-Transmission
Network
Technical
Losses
研究起点
研究来源
研究分支
研究去脉
引文网络交叉学科
相关学者/机构
期刊影响力
电力能源(英文)
月刊
2327-588X
武汉市江夏区汤逊湖北路38号光谷总部空间
出版文献量(篇)
568
总下载数(次)
0
总被引数(次)
0
论文1v1指导