基本信息来源于合作网站,原文需代理用户跳转至来源网站获取       
摘要:
This study relies on the project about Jining to Tongliao railway electrification reconstruction project.The dynamic simulation model of the pantograph-OCS (overhead contact system) suitable for Jitong project is designed,according to the corresponding numerical calculation method and workflow.Firstly,We establish the pantograph and catenary's BIM models,and the parameters related to the dynamic simulation of the pantograph system are attached to the BIM model.Then,the BIM model is transformed into a mechanical analysis model,which is input into the dynamic simulation software of pantograph-OCS.The rationality of the design scheme of the pantograph system is verified through simulation.
内容分析
关键词云
关键词热度
相关文献总数  
(/次)
(/年)
文献信息
篇名 Research on Pantograph and Overhead Contact System's Simulation of High Speed Railway and Comparison of Three Calculation Methods by Finite Element Method
来源期刊 国际设备工程与管理(英文版) 学科
关键词
年,卷(期) 2021,(1) 所属期刊栏目
研究方向 页码范围 46-56
页数 11页 分类号
字数 语种 英文
DOI 10.13434/j.cnki.1007-4546.2021.0104
五维指标
传播情况
(/次)
(/年)
引文网络
引文网络
二级参考文献  (0)
共引文献  (0)
参考文献  (0)
节点文献
引证文献  (0)
同被引文献  (0)
二级引证文献  (0)
2021(0)
  • 参考文献(0)
  • 二级参考文献(0)
  • 引证文献(0)
  • 二级引证文献(0)
引文网络交叉学科
相关学者/机构
期刊影响力
国际设备工程与管理(英文版)
季刊
1007-4546
61-1299/TB
16开
西安西北工业大学647号信箱
1996
eng
出版文献量(篇)
747
总下载数(次)
0
总被引数(次)
1211
  • 期刊分类
  • 期刊(年)
  • 期刊(期)
  • 期刊推荐
论文1v1指导