Earned duration management(EDM)is a methodology for project schedule management(PSM)that can be considered an alternative to earned value management(EVM).EDM provides an estimation of devia-tions in schedule and a final project duration estimation.There is a key difference between EDM and EVM:In EDM,the value of activities is expressed as work periods;whereas in EVM,value is expressed in terms of cost.In this paper,we present how EDM can be applied to monitor and control stochastic pro-jects.To explain the methodology,we use a real case study with a project that presents a high level of uncertainty and activities with random durations.We analyze the usability of this approach according to the activities network topology and compare the EVM and earned schedule methodology(ESM)for PSM.
推荐文章
基于STK/Schedule实现中继卫星业务调度
跟踪与数据中继卫星系统
调度算法
可见性
任务约束
Project软件在项目管理中的应用
Project软件
计划
进度
控制
Hydrogeochemical evaluation and statistical analysis of groundwater of Sylhet, north-eastern Banglad
Arsenic
Groundwater
Hydrogeochemistry
Multivariate statistics
Spatial distribution
内容分析
关键词云
关键词热度
相关文献总数  
(/次)
(/年)
文献信息
篇名 Stochastic Earned Duration Analysis for Project Schedule Management
来源期刊 工程(英文) 学科
关键词
年,卷(期) 2022,(2) 所属期刊栏目 Managing Projects under Uncertainty—Review
研究方向 页码范围 148-161
页数 14页 分类号
字数 语种 英文
DOI
五维指标
传播情况
(/次)
(/年)
引文网络
引文网络
二级参考文献  (0)
共引文献  (0)
参考文献  (0)
节点文献
引证文献  (0)
同被引文献  (0)
二级引证文献  (0)
2022(0)
  • 参考文献(0)
  • 二级参考文献(0)
  • 引证文献(0)
  • 二级引证文献(0)
引文网络交叉学科
相关学者/机构
期刊影响力
工程(英文)
双月刊
2095-8099
10-1244/N
16开
北京市朝阳区惠新东街4号
80-744
2015
eng
出版文献量(篇)
817
总下载数(次)
8
论文1v1指导