<正> Up to now, the beam diagnostic monitors for the injection line of CSR main ring such as Faraday cups, viewing screens, slits, and TOF phase probes have been finished. The vacuum test and the driven system for all the monitors were made in the lab. Some of monitors have been installed on the beam line. The ceramic insolated vacuum tube for the beam transformer was manufactured. The ferromagnetic core is under development.