基本信息来源于合作网站,原文需代理用户跳转至来源网站获取       
摘要:
Change orders are common and clearly noticeable in Jordanian construction industry. Several studies have identified change orders as significant problem in Jordanian construction projects, and they mainly cause delay and cost overrun. This situation spurs the researchers for investigating the significant causes of change orders in construction projects. Thus, this paper aims to determine the main causes of change orders in the Jordanian construction private sector which responsible for significant cost overrun. Both qualitative and quantitative methods, i.e. interview and questionnaire techniques, were used to achieve this aim. Interviews were conducted as the first stage of data collection, and the results formed the basis of the questionnaire, which was distributed across the Jordanian construction sector. Content analysis was used to analyse the interview responses, while factor analysis, correlation and the Severity Index (SI) were used to analyse the questionnaire results. The findings identified three main categories of causes of change orders in private sector, namely engineering causes, causes related to the client, and circumstances of the project, with sub-causes in each category which are related to each other in significant ways and which affect each other.
内容分析
关键词云
关键词热度
相关文献总数  
(/次)
(/年)
文献信息
篇名 Causes of Change Orders in the Jordanian Construction Industry
来源期刊 房屋建造与规划研究(英文) 学科 医学
关键词 Change ORDERS Construction PROJECT JORDAN PRIVATE SECTOR
年,卷(期) 2018,(4) 所属期刊栏目
研究方向 页码范围 234-250
页数 17页 分类号 R73
字数 语种
DOI
五维指标
传播情况
(/次)
(/年)
引文网络
引文网络
二级参考文献  (0)
共引文献  (0)
参考文献  (0)
节点文献
引证文献  (0)
同被引文献  (0)
二级引证文献  (0)
2018(0)
  • 参考文献(0)
  • 二级参考文献(0)
  • 引证文献(0)
  • 二级引证文献(0)
研究主题发展历程
节点文献
Change
ORDERS
Construction
PROJECT
JORDAN
PRIVATE
SECTOR
研究起点
研究来源
研究分支
研究去脉
引文网络交叉学科
相关学者/机构
期刊影响力
房屋建造与规划研究(英文)
季刊
2328-4889
武汉市江夏区汤逊湖北路38号光谷总部空间
出版文献量(篇)
127
总下载数(次)
0
总被引数(次)
0
论文1v1指导