Boil-Off Gas creation and usage has been a source of worry in Liquefied Natural Gas value supply chain. BOG is generated when there is temperature gradient between the environment and LNG temperature within the carrier tank, process lines or vessels. In this work, Computer Aided Design for the recovery of BOG from flare in an LNG Plant considered the dynamic nature of the BOG with minimized total energy consumption. A rigorous simulation based optimization model using HYSYS V8.8 was presented. Possible BOG scenarios were formulated in this report and considerations taken from the BOG scenarios to form the basic scope of this work. An Aspen HYSYS Software was used to develop a Process Flow Scheme (PFS) which was simulated using the BOG scenarios formulated. The BOG scenario temperatures considered were -15°C for Warm Ship analogy, -90°C for Cold Ship and -140°C for Normal Design Mode. Assumptions were also made on the feed into the developed PFS before quenching the various BOG temperatures. With HYSYS simulation at assumed constant inlet mass flow rate of 25,000 kg/s for BOG FEED, 6250 kg/s for LNG & LNG1 FEED, quenching at various BOG feed temperature -15°C, -90°C and -140°C, gave a meaningful output. The Mass flow rate recovered from Warm Ship at -15°C for Cold Product was 35,183 Kg/s and for Liquid Product 2317 Kg/s. For Cold ship at -90°C, the Cold Product recovered was 32,174 Kg/s and Liquid Product was 5326 Kg/s. Also, for -140°C, the Cold Product was 28,004 Kg/s and the Liquid Product was 9496 Kg/s. The Energy stream for the Compressor, Cooler and Pump in the Process Flow Stream (PFS) were observed in Table 5. At -15°C, the Compressor energy was 3.22E+07KJ/h, while the Pump energy was 3412KJ/h, and the Cooler gave 1.90E+07KJ/h. The results above showed that excessive BOG from Warm ship can be quenched and recovered for other end users rather than undue flaring of the gases. Extra work needs to be done to ensure minimal energy utilisation, optimal recovery and high efficiency of this developed mod
推荐文章
BOG-LNG系统联合运行技术研究
BOG
直接压缩
再冷凝
LNG加气站槽车BOG压缩液化回收研究
压缩液化
BOG回收
LNG加气站
槽车
LNG接收站蒸发气处理系统静态设计计算模型
LNG
接收站
储罐
BOG设计
计算
模型
LNG接收站蒸发气处理系统静态设计计算模型
LNG
接收站
储罐
BOG设计
计算
模型
内容分析
关键词云
关键词热度
相关文献总数  
(/次)
(/年)
文献信息
篇名 Computer Aided Design for the Recovery of Boil-Off Gas from LNG Plant
来源期刊 化学工程与科学期刊(英文) 学科 医学
关键词 Boil-Off GAS Liquefied NATURAL GAS Process Flow Scheme QUENCHING Simulation
年,卷(期) 2019,(2) 所属期刊栏目
研究方向 页码范围 159-175
页数 17页 分类号 R73
字数 语种
DOI
五维指标
传播情况
(/次)
(/年)
引文网络
引文网络
二级参考文献  (0)
共引文献  (0)
参考文献  (0)
节点文献
引证文献  (0)
同被引文献  (0)
二级引证文献  (0)
2019(0)
  • 参考文献(0)
  • 二级参考文献(0)
  • 引证文献(0)
  • 二级引证文献(0)
研究主题发展历程
节点文献
Boil-Off
GAS
Liquefied
NATURAL
GAS
Process
Flow
Scheme
QUENCHING
Simulation
研究起点
研究来源
研究分支
研究去脉
引文网络交叉学科
相关学者/机构
期刊影响力
化学工程与科学期刊(英文)
季刊
2160-0392
武汉市江夏区汤逊湖北路38号光谷总部空间
出版文献量(篇)
386
总下载数(次)
0
总被引数(次)
0
论文1v1指导