In terms of controlling groundwater in deep foundation pit projects, the usual methods include increasing the curtain depth, reducing the amount of pumped groundwater, and implementing integrated control, in order to reduce the drawdown and land subsidence outside pits. In dewatering design for confined water, factors including drawdown requirements, the thickness of aquifers, the depth of dewatering wells and the depth of cutoff curtains have to be considered comprehensively and numerical simulations are generally conducted for calculation and analysis. Longyang Road Station on Shanghai Metro Line 18 is taken as the case study subject in this paper, a groundwater seepage model is developed according to the on-site engineering geological conditions and hydrogeological conditions, the excavation depth of the foundation pit as well as the design depth of the enclosure, hydrogeological parameters are determined via the pumping test, and the foundation pit dewatering is simulated by means of the three-dimensional finite difference method, which produces numerical results that consistent with real monitoring data as to the groundwater table. Besides, the drawdown and the land subsidence both inside and outside the pit caused by foundation pit dewatering are calculated and analyzed for various curtain depths. This study reveals that the drawdown and the land subsidence change faster near the curtain with the increase in the curtain depth, and the gradient of drawdown and land subsidence changes dwindles beyond certain depths. In this project, the curtain depth of 47/49 m is adopted, and a drawdown-land subsidence verification test is completed given hanging curtains before the excavation. The result turns out that the real measurements basically match the calculation results from the numerical simulation, and by increasing the depth of curtains, the land subsidence resulting from dewatering is effectively controlled.
推荐文章
Xilinx Foundation的仿真分析
Xilinx Foundation FPGA 脚本仿真 双向串并/并串收发器
基于Metro的现代铜电解设计理念及应用
铜电解精炼
工艺改造
不锈钢阴极
METRO
自动化
The Road Not Taken中的象征主义及其艺术特征
罗伯特·弗罗斯特
The Road Not Taken
象征主义
艺术特征
Deep web接口查询能力估计
查询接口
查询能力
内容分析
关键词云
关键词热度
相关文献总数  
(/次)
(/年)
文献信息
篇名 Numerical simulation and land subsidence control for deep foundation pit dewatering of Longyang Road Station on Shanghai Metro Line 18
来源期刊 地下水科学与工程:英文版 学科 工学
关键词 Deep FOUNDATION PIT Engineering DEWATERING Numerical simulation GROUNDWATER Land SUBSIDENCE Verification test
年,卷(期) dxskxygcywb,(2) 所属期刊栏目
研究方向 页码范围 133-144
页数 12页 分类号 TV
字数 语种
DOI
五维指标
传播情况
(/次)
(/年)
引文网络
引文网络
二级参考文献  (0)
共引文献  (0)
参考文献  (0)
节点文献
引证文献  (0)
同被引文献  (0)
二级引证文献  (0)
2019(0)
  • 参考文献(0)
  • 二级参考文献(0)
  • 引证文献(0)
  • 二级引证文献(0)
研究主题发展历程
节点文献
Deep
FOUNDATION
PIT
Engineering
DEWATERING
Numerical
simulation
GROUNDWATER
Land
SUBSIDENCE
Verification
test
研究起点
研究来源
研究分支
研究去脉
引文网络交叉学科
相关学者/机构
期刊影响力
地下水科学与工程:英文版
季刊
2305-7068
河北省石家庄市中华北大街268号
出版文献量(篇)
277
总下载数(次)
0
论文1v1指导