Progress measurement is cardinal for effective project delivery. It assesses the physical amount of completed work within budgeted cost and manpower performance at a specified stage of the project. Effective progress measurement facilitates progress monitoring, an inevitability for identifying early warning?signs and confirmation of structured work proceeding. Different progress measuring methods are available and used for construction projects. They range from the traditional to the contemporary ones like three-dimensional and four-dimensional models. This paper examines current progress measurement methods used in the Ghanaian construction industry. Eight commonly employed methods were identified from the literature?and?rated by sixty-two construction professionals, practicing with tier one construction firms and construction consultancy services. Relative Important Index ranking and Mann-Whitney?U?test statistics were used to rank and check the consistency of survey responses. Cost Ratio ranked?the?highest, followed by Supervisor’s Opinion and Units?Completed. The fourth-ranked method was Time Ratio, then Incremental Milestone before Start-Finish.?Weighted/Equivalent Units?was at?the penultimate with Earned Value Analysis ranked?the?lowest. The study will not only underscore the relevance of the current project progress measurement practices and provoke prolific debates on their merits, but will also serve as a precursor for critical evaluation of the methods with the view to identifying?barriers militating against realistic progress assessment of construction works.
推荐文章
内容分析
关键词云
关键词热度
相关文献总数  
(/次)
(/年)
文献信息
篇名 Professionals’ Perceptions on Construction Progress Measurement Methods Used in Ghana
来源期刊 世界工程和技术(英文) 学科 经济
关键词 CONSTRUCTION PROGRESS Measurement Methods CONSTRUCTION PROFESSIONALS Tier One CONSTRUCTION COMPANIES Ghana
年,卷(期) 2020,(2) 所属期刊栏目
研究方向 页码范围 145-158
页数 14页 分类号 F42
字数 语种
DOI
五维指标
传播情况
(/次)
(/年)
引文网络
引文网络
二级参考文献  (0)
共引文献  (0)
参考文献  (0)
节点文献
引证文献  (0)
同被引文献  (0)
二级引证文献  (0)
2020(0)
  • 参考文献(0)
  • 二级参考文献(0)
  • 引证文献(0)
  • 二级引证文献(0)
研究主题发展历程
节点文献
CONSTRUCTION
PROGRESS
Measurement
Methods
CONSTRUCTION
PROFESSIONALS
Tier
One
CONSTRUCTION
COMPANIES
Ghana
研究起点
研究来源
研究分支
研究去脉
引文网络交叉学科
相关学者/机构
期刊影响力
世界工程和技术(英文)
季刊
2331-4222
武汉市江夏区汤逊湖北路38号光谷总部空间
出版文献量(篇)
482
总下载数(次)
0
总被引数(次)
0
论文1v1指导