作者:
基本信息来源于合作网站,原文需代理用户跳转至来源网站获取       
摘要:
Since the construction industry has been adopting Building Information Modeling(BIM)as the standard practice for design,engineering,and fabrication in the recent decade,many Construction Management(CM)programs at U.S.universities have started to introduce BIM for cost estimating in their curriculum.Although considered as the fifth dimension beyond 3D and schedule,BIM for cost estimating in many cases is still used merely as an alternative model-based quantity takeoff method to the traditional plan-based approach.The disconnection between automated quantity takeoff and cost estimating,however,still exists,and the benefits of the BIM process in a project life cycle can not be fully understood by CM students without realizing its impact in the preconstruction phase.To bridge these gaps in a CM curriculum,an Advanced Cost Estimating course for CM programs has been developed that focuses on integrating BIM in both the takeoff and estimating process.The new course streamlines the connection between model-based quantity takeoff and cost estimating with the help of a combination of multiple construction software programs.Through the integration between the software,quantity data from a BIM model can be seamlessly transferred to a construction cost database for bid pricing and reporting.This paper presents the development of the new Advanced Cost Estimating course as a case study,including its objectives,layout,and assessment methods,and provides empirical and valuable insights on how to integrate BIM in a cost estimating course for a CM curriculum.
推荐文章
Optimizing the ratio of the spike to sample for isotope dilution analysis: a case study with seleniu
Isotope dilution method
Error propagation
Mento Carlo
Se concentration
Geological reference materials
Elemental characteristics and paleoenvironment reconstruction: a case study of the Triassic lacustri
Trace elements
Occurrence mode
Paleoenvironment
Zhangjiatan oil shale
Yanchang Formation
Ordos Basin
Hydrodynamic characteristics of Wujiangdu Reservoir during the dry season—a case study of a canyon r
Canyon reservoir
Hydrodynamic characteristics
A transition zone
Wujiang River
Iron isotope fractionation during fenitization: a case study of carbonatite dykes from Bayan Obo, In
Iron isotopes
Fenitization
Fluid exsolution
Carbonatite
Bayan Obo
内容分析
关键词云
关键词热度
相关文献总数  
(/次)
(/年)
文献信息
篇名 Streamlining Takeoff and Estimating with BIM:A Case Study of a Construction Cost Estimating Course
来源期刊 土木工程与建筑:英文版 学科 工学
关键词 Quantity takeoff cost estimating BIM CM EDUCATION
年,卷(期) 2021,(1) 所属期刊栏目
研究方向 页码范围 35-41
页数 7页 分类号 TU1
字数 语种
DOI
五维指标
传播情况
(/次)
(/年)
引文网络
引文网络
二级参考文献  (0)
共引文献  (0)
参考文献  (0)
节点文献
引证文献  (0)
同被引文献  (0)
二级引证文献  (0)
2021(0)
  • 参考文献(0)
  • 二级参考文献(0)
  • 引证文献(0)
  • 二级引证文献(0)
研究主题发展历程
节点文献
Quantity
takeoff
cost
estimating
BIM
CM
EDUCATION
研究起点
研究来源
研究分支
研究去脉
引文网络交叉学科
相关学者/机构
期刊影响力
土木工程与建筑:英文版
月刊
1934-7359
武汉洪山区卓刀泉北路金桥花园C座4楼
出版文献量(篇)
1394
总下载数(次)
3
总被引数(次)
0
论文1v1指导