Handoff processes during civil infrastructure operations are transitions between sequential tasks.Typical handoffs constantly involve cognitive and communication activities among operations personnel,as well as traveling activities.Large civil infrastructures,such as nuclear power plants (NPPs),provide critical services to modem cities but require regular or unexpected shutdowns (i.e.,outage) for maintenance.Handoffs during such an outage contain interwoven workflows and communication activities that pose challenges to the cognitive and communication skills of handoff participants and constantly result in delays.Traveling time and changing field conditions bring additional challenges to effective coordination among multiple groups of people.Historical NPP records studied in this research indicate that even meticulous planning that takes six months before each outage could hardly guarantee sufficient back-up plans for handling various unexpected events.Consequently,delays frequently occur in NPP outages and bring significant socioeconomic losses.A synthesis of previous studies on the delay analysis of accelerated maintenance schedules revealed the importance and challenges of handoff modeling.However,existing schedule representation methods could hardly represent the interwoven communication,cognitive,traveling,and working processes of multiple participants collaborating on completing scheduled tasks.Moreover,the lack of formal models that capture how cognitive,waiting,traveling,and communication issues affect outage workflows force managers to rely on personal experiences in diagnosing delays and coordinating multiple teams involved in outages.This study aims to establish formal models through agent-based simulation to support the analytical assessment of outage schedules with full consideration of cognitive and communication factors involved in handoffs within the NPP outage workflows.Simulation results indicate that the proposed handoff modeling can help predict the impact of cognitive and communication issues on delays propagating throughout outage schedules.Moreover,various activities are fully considered,including traveling between workspaces and waiting.Such delay prediction capability paves the path toward predictive and resilience outage control of NPPs.
推荐文章
MIDAS/CIVIL软件在桥梁设计中的应用
MidasCivil
桥梁设计
预应力配束
有限元计算
基于Midas Civil分析的幕墙钢结构计算
幕墙
钢结构
静力分析
连接计算
AutoCAD Civil 3D在土方工程中的应用
Civil 3D
数字地形曲面
土方工程量
道路工程挖填量
Groundwater quality assessment using multivariate analysis, geostatistical modeling, and water quali
Groundwater
Multivariate analysis
Geostatistical modeling
Geochemical modeling
Mineralization
Ordinary Kriging
内容分析
关键词云
关键词热度
相关文献总数  
(/次)
(/年)
文献信息
篇名 Modeling and simulating the impact of forgetting and communication errors on delays in civil infrastructure shutdowns
来源期刊 工程管理前沿(英文版) 学科
关键词
年,卷(期) 2021,(1) 所属期刊栏目 Special issue:City and infrastructure engineering and management
研究方向 页码范围 109-121
页数 13页 分类号
字数 语种 英文
DOI
五维指标
传播情况
(/次)
(/年)
引文网络
引文网络
二级参考文献  (0)
共引文献  (0)
参考文献  (32)
节点文献
引证文献  (0)
同被引文献  (0)
二级引证文献  (0)
1985(1)
  • 参考文献(1)
  • 二级参考文献(0)
1997(1)
  • 参考文献(1)
  • 二级参考文献(0)
2000(2)
  • 参考文献(2)
  • 二级参考文献(0)
2001(2)
  • 参考文献(2)
  • 二级参考文献(0)
2002(1)
  • 参考文献(1)
  • 二级参考文献(0)
2003(1)
  • 参考文献(1)
  • 二级参考文献(0)
2006(2)
  • 参考文献(2)
  • 二级参考文献(0)
2007(1)
  • 参考文献(1)
  • 二级参考文献(0)
2008(1)
  • 参考文献(1)
  • 二级参考文献(0)
2009(1)
  • 参考文献(1)
  • 二级参考文献(0)
2010(2)
  • 参考文献(2)
  • 二级参考文献(0)
2012(3)
  • 参考文献(3)
  • 二级参考文献(0)
2013(4)
  • 参考文献(4)
  • 二级参考文献(0)
2014(1)
  • 参考文献(1)
  • 二级参考文献(0)
2015(2)
  • 参考文献(2)
  • 二级参考文献(0)
2016(3)
  • 参考文献(3)
  • 二级参考文献(0)
2017(2)
  • 参考文献(2)
  • 二级参考文献(0)
2018(1)
  • 参考文献(1)
  • 二级参考文献(0)
2019(1)
  • 参考文献(1)
  • 二级参考文献(0)
2021(0)
  • 参考文献(0)
  • 二级参考文献(0)
  • 引证文献(0)
  • 二级引证文献(0)
引文网络交叉学科
相关学者/机构
期刊影响力
工程管理前沿(英文版)
季刊
2095-7513
10-1205/N
16开
北京市朝阳区惠新东街4号富盛大厦15层
2014
eng
出版文献量(篇)
393
总下载数(次)
1
总被引数(次)
290
论文1v1指导