Entry roof truss-bolt system test under the gob of contiguous seams
基本信息来源于合作网站,原文需代理用户跳转至来源网站获取
摘要:
Roof bolt support system has been widely applied in the No.7.9 seam in Caozhuang coal mine.However,it has not been able to be applied in the NO.10-2 seam since the small interburden(2m)between NO.9 and NO.10-2 seam.The NO.9 and NO.10-2 seams are contiguous seams.The NO.9 seam has been mined out and the NO.10-2 seam will be mined under the gob of the NO.9 seam.The roof strata of the NO.10-2 seam may have been weakened and fractured due to the shear failure caused by the NO.9 seam mining activities.The steel beam sets spaced at 0.8 m have been used to support the entry of the NO.10-2 seam.In order to speed up the advance rate and cut entry development cost,a test area,using roof bolt in conjunction with truss-system,was successfully conducted.This paper presents the support system design,application of designed system,and the test results.Test results provide a cheaper,quicker,and safer way to support entry for the No.10-2 seam.