基本信息来源于合作网站,原文需代理用户跳转至来源网站获取       
摘要:
Risk evaluation is fundamental to eliminate and prenent any kind of public emergencies ,while that for railway public emergencies is the foundation to guarantee railway sicurity.With the researches on the flow and methods of risk evaluation and the evaltation on railway public evtergencies during 2008 Beijing Olympic Games,the article puts forward measures and suggestions for risk control,providing reference for decision making by government departments,the Organizing Committee of Beijing Olympic Games,and the Security Coorduating Tean of Beijing Olympics as well as jproviding basis for solutions by the Security Control Center of Beijing Olympics and the relevant dipartments of railway sector.
推荐文章
期刊_丙丁烷TDLAS测量系统的吸收峰自动检测
带间级联激光器
调谐半导体激光吸收光谱
雾剂检漏 中红外吸收峰 洛伦兹光谱线型
期刊_联合空间信息的改进低秩稀疏矩阵分解的高光谱异常目标检测
高光谱图像
异常目标检测 低秩稀疏矩阵分解 稀疏矩阵 残差矩阵
内容分析
关键词云
关键词热度
相关文献总数  
(/次)
(/年)
文献信息
篇名 RISK EVALUATION ON RAILWAY PUBLIC EMERGENCIES DURING 2008 BEIJING OLYMPIC GAMES
来源期刊 中国铁路(英文版) 学科
关键词 railway public emergencies risk evaltation risk control Beijing Olympic Games
年,卷(期) 2008,(1) 所属期刊栏目
研究方向 页码范围 48-55
页数 8页 分类号
字数 语种 英文
DOI
五维指标
传播情况
(/次)
(/年)
引文网络
引文网络
二级参考文献  (0)
共引文献  (0)
参考文献  (0)
节点文献
引证文献  (0)
同被引文献  (0)
二级引证文献  (0)
2008(0)
  • 参考文献(0)
  • 二级参考文献(0)
  • 引证文献(0)
  • 二级引证文献(0)
研究主题发展历程
节点文献
railway public emergencies
risk evaltation
risk control
Beijing Olympic Games
研究起点
研究来源
研究分支
研究去脉
引文网络交叉学科
相关学者/机构
期刊影响力
中国铁路(英文版)
半年刊
11-3231/U
北京市西外大柳树路2号
eng
出版文献量(篇)
40
总下载数(次)
0
总被引数(次)
0
论文1v1指导