Critical Path Method (CPM) Scheduling has proven to be an effective project management tool. However, teaching the topic has proven difficult to include all elements of CPM yet keep it simple enough for students to understand. In an effort to simplify the teaching of critical path method scheduling, the issue of two total floats in an activity does not get the attention necessary to address its occurrence. The objective of this paper is to present a mathematical method to show multiple total floats are possible for an activity. Also presented are suggestions for schedule crashing when multiple total floats are found. Two totals floats can be found if constraints (Lag or Lead) or non-Finish-to-Start (FS) relationships, or both are used in a network diagram. Situations are possible where an activity may have a start total float (STF) of zero but have a finish total float (FTF) greater than zero, or vice versa. Because the critical path generally follows the zero total float, these situations, where either the STF or the FTF is critical while the other is not, determines how the critical path activity must be controlled and crashed. This paper will present approaches of how to crash the schedule when a portion of the activity, either start or finish, is critical. Also presented will be methods to teach the subject matter with or without the use of scheduling software. Critical Path Method was revisited to see what the minimal conditions are needed to have activities with two total float. Generalized crashing methods were studied to see if the methods can be used when two total floats exist.
推荐文章
基于STK/Schedule实现中继卫星业务调度
跟踪与数据中继卫星系统
调度算法
可见性
任务约束
一种基于XML的One to One营销优化建模方法
One to One营销优化模型
XML
DOM
自定义建模
一类One to One营销优化模型及其解决方案
One to One营销优化
优化模型
线性规划算法
MATLAB
Application of K-means and PCA approaches to estimation of gold grade in Khooni district (central Ir
K-means method
Clustering
Principal
component analysis (PCA)
Estimation
Gold
Khooni district
内容分析
关键词云
关键词热度
相关文献总数  
(/次)
(/年)
文献信息
篇名 Understanding the Occurrence of Two Total Floats in One Activity and Schedule Crashing Approaches for That Situation
来源期刊 房屋建造与规划研究(英文) 学科 医学
关键词 Critical Path Method Multiple Total FLOATS SCHEDULE Crashing CONSTRAINTS Lag/Lead
年,卷(期) 2013,(3) 所属期刊栏目
研究方向 页码范围 67-74
页数 8页 分类号 R73
字数 语种
DOI
五维指标
传播情况
(/次)
(/年)
引文网络
引文网络
二级参考文献  (0)
共引文献  (0)
参考文献  (0)
节点文献
引证文献  (0)
同被引文献  (0)
二级引证文献  (0)
2013(0)
  • 参考文献(0)
  • 二级参考文献(0)
  • 引证文献(0)
  • 二级引证文献(0)
研究主题发展历程
节点文献
Critical
Path
Method
Multiple
Total
FLOATS
SCHEDULE
Crashing
CONSTRAINTS
Lag/Lead
研究起点
研究来源
研究分支
研究去脉
引文网络交叉学科
相关学者/机构
期刊影响力
房屋建造与规划研究(英文)
季刊
2328-4889
武汉市江夏区汤逊湖北路38号光谷总部空间
出版文献量(篇)
127
总下载数(次)
0
总被引数(次)
0
论文1v1指导