Conventionally,mining industry relies on a deterministic view,where a unique mine plan is determined based on a single resource model.A major shortfall of this approach is the inability to assess the risk caused by the well-known geological uncertainty,i.e.the in situ grade and tonnage variability of the mineral deposit.Despite some recent attempts in developing stochastic mine planning models which have demonstrated promising results,the industry still remains sceptical about this innovative idea.With respect to unbiased linear estimation,kriging is the most popular and reliable deterministic interpolation technique for resource estimation and it appears to remain its popularity in the near future.This paper presents a new systematic framework to quantify the risk of kriging-based mining projects due to the geological uncertainties.Firstly,conditional simulation is implemented to generate a series of equally-probable orebody realisations and these realisations are then compared with the kriged resource model to analyse its geological uncertainty.Secondly,a production schedule over the life of mine is determined based on the kriged resource model.Finally,risk profiles of that production schedule,namely ore and waste tonnage production,blending grade and Net Present Value (NPV),are constructed using the orebody realisations.The proposed model was applied on a multi-element deposit and the result demonstrates that that the kdging-based mine plan is unlikely to meet the production targets.Especially,the kriging-based mine plan overestimated the expected NPV at a magnitude of 6.70% to 7.34% (135 M$ to 151 M$).A new multivariate conditional simulation framework was also introduced in this paper to cope with the multivariate nature of the deposit.Although an iron ore deposit is used to prove the concepts,the method can easily be adapted to other kinds of mineral deposits,including surface coal mine.
推荐文章
期刊_丙丁烷TDLAS测量系统的吸收峰自动检测
带间级联激光器
调谐半导体激光吸收光谱
雾剂检漏 中红外吸收峰 洛伦兹光谱线型
期刊_联合空间信息的改进低秩稀疏矩阵分解的高光谱异常目标检测
高光谱图像
异常目标检测 低秩稀疏矩阵分解 稀疏矩阵 残差矩阵
内容分析
关键词云
关键词热度
相关文献总数  
(/次)
(/年)
文献信息
篇名 A new generic open pit mine planning process with risk assessment ability
来源期刊 国际煤炭科学技术学报(英文) 学科
关键词 Open pit mine planning Geological uncertainty Multivariate conditional simulation Grade/tonnage curves
年,卷(期) 2016,(4) 所属期刊栏目
研究方向 页码范围 407-417
页数 11页 分类号
字数 语种 英文
DOI 10.1007/s40789-016-0152-z
五维指标
传播情况
(/次)
(/年)
引文网络
引文网络
二级参考文献  (43)
共引文献  (5)
参考文献  (14)
节点文献
引证文献  (0)
同被引文献  (0)
二级引证文献  (0)
1982(1)
  • 参考文献(0)
  • 二级参考文献(1)
1985(1)
  • 参考文献(1)
  • 二级参考文献(0)
1987(2)
  • 参考文献(0)
  • 二级参考文献(2)
1990(1)
  • 参考文献(0)
  • 二级参考文献(1)
1993(1)
  • 参考文献(1)
  • 二级参考文献(0)
1997(1)
  • 参考文献(0)
  • 二级参考文献(1)
2000(3)
  • 参考文献(2)
  • 二级参考文献(1)
2002(2)
  • 参考文献(0)
  • 二级参考文献(2)
2003(2)
  • 参考文献(2)
  • 二级参考文献(0)
2004(5)
  • 参考文献(1)
  • 二级参考文献(4)
2006(1)
  • 参考文献(0)
  • 二级参考文献(1)
2007(1)
  • 参考文献(0)
  • 二级参考文献(1)
2008(5)
  • 参考文献(0)
  • 二级参考文献(5)
2009(3)
  • 参考文献(0)
  • 二级参考文献(3)
2010(4)
  • 参考文献(0)
  • 二级参考文献(4)
2011(4)
  • 参考文献(2)
  • 二级参考文献(2)
2012(6)
  • 参考文献(2)
  • 二级参考文献(4)
2013(2)
  • 参考文献(0)
  • 二级参考文献(2)
2014(1)
  • 参考文献(1)
  • 二级参考文献(0)
2016(5)
  • 参考文献(0)
  • 二级参考文献(5)
2017(2)
  • 参考文献(1)
  • 二级参考文献(1)
2018(3)
  • 参考文献(0)
  • 二级参考文献(3)
2019(1)
  • 参考文献(1)
  • 二级参考文献(0)
2016(5)
  • 参考文献(0)
  • 二级参考文献(5)
  • 引证文献(0)
  • 二级引证文献(0)
研究主题发展历程
节点文献
Open pit mine planning
Geological uncertainty
Multivariate conditional simulation
Grade/tonnage curves
研究起点
研究来源
研究分支
研究去脉
引文网络交叉学科
相关学者/机构
期刊影响力
国际煤炭科学技术学报(英文)
季刊
2095-8293
10-1252/TD
eng
出版文献量(篇)
299
总下载数(次)
0
论文1v1指导