基本信息来源于合作网站,原文需代理用户跳转至来源网站获取       
摘要:
This paper aims to assess the Initial Investment Valuation Methodology of the local regulator, facing the results of auctions, due to the high occurrence of low clearing prices observed from 2003 to 2008 and the high percentage of auctions without any bidder recently. The regulator investment forecasted defines the maximum value of Yearly Allowed Revenue and the bidder that offers the lowest YAR value wins the auction. The first type of analysis considers project cost, location, execution deadline, transmission line extension and type of all actions from 1999 to 2015, totalling about 3.361 billion USD. It was not found any correlation of those variables and the result of the actions. The second analysis compared the equipment and the additional costs breakdown of the regulator investment forecast with the real investment in projects from 2009 to 2013 and it rarely surpasses 5%. Suggestions are proposed based on the analysis.
推荐文章
逻辑参数库中Power参数的提取
逻辑参数
Power提取
激励波形
日产公司新型混合动力总成"e-POWER"
混合动力汽车
e-POWER
燃油系统设计
实际应用条件下Power MOSFET开关特性研究(上)
Power MOSFET
开关特性
开通
关断
密勒效应
FoxPro数据库在Power Builder中的使用
面向对象 Power Builder FoxPro 数据库 ODBC DBMS VFP SQL Anywhere
内容分析
关键词云
关键词热度
相关文献总数  
(/次)
(/年)
文献信息
篇名 Assessment of Initial Investment Valuation Methodology of Brazilian Power Transmissions Auction
来源期刊 电力能源(英文) 学科 医学
关键词 BRAZILIAN AUCTION CLEARING PRICES Transmission Line VALUATION
年,卷(期) 2017,(1) 所属期刊栏目
研究方向 页码范围 75-90
页数 16页 分类号 R73
字数 语种
DOI
五维指标
传播情况
(/次)
(/年)
引文网络
引文网络
二级参考文献  (0)
共引文献  (0)
参考文献  (0)
节点文献
引证文献  (0)
同被引文献  (0)
二级引证文献  (0)
2017(0)
  • 参考文献(0)
  • 二级参考文献(0)
  • 引证文献(0)
  • 二级引证文献(0)
研究主题发展历程
节点文献
BRAZILIAN
AUCTION
CLEARING
PRICES
Transmission
Line
VALUATION
研究起点
研究来源
研究分支
研究去脉
引文网络交叉学科
相关学者/机构
期刊影响力
电力能源(英文)
月刊
2327-588X
武汉市江夏区汤逊湖北路38号光谷总部空间
出版文献量(篇)
568
总下载数(次)
0
总被引数(次)
0
论文1v1指导