HIRFL accelerator facility has been operated with two ion sources as its pre-injectors,which are LECR3 and SECRAL-II.In 2018,there were 19 kinds of ion beams delivered successfully,and the service time of the two sources are 4594.5 and 2231 h respectively,amounting to 6825.5 h in total,in which SECRAL and LECR3 provided 4 and 1 kinds of metallic ion beams respectively,and the total service time for the metallic ones is 2322 h,accounting for 34%of the total service time.Table 1 summarizes the main information about the ion beams delivered by the two ion sources.