Stakeholder involvement in the project planning process should include a variety of actors with different roles and responsibilities at the planning phase of the project life cycle. Failure to adequately plan greatly reduces the project’s chances of successfully accomplishing its goals. The objective of this study was to determine the influence of stakeholder participation in project planning on the completion of urban road transport-infrastructure projects in Kenya. Pragmatic research paradigm was utilized for this study to facilitate mixed research methods. The study adopted descriptive survey and correlational research design. The target population was 1593. A sample size of 309 respondents was drawn utilizing purposive and simple random sampling procedures. A five point Likert type scale questionnaire was used to collect quantitative data while interview guides were used to collect qualitative data. The study found that stakeholder participation in project planning had a positive and significant influence on the completion of urban road transport infrastructure projects in Kenya (r = 0.838, R2 = 0.703, F (4, 209) = 123.43, p 2 = 0.703 indicating that stakeholder participation in project planning explains 70.3% of the variations in the completion of urban road transport infrastructure projects in Kenya. The study concluded that stakeholder participation in project planning significantly influences completion of urban road transport-infrastructure projects in Kenya. The study recommends the need to increase training and awareness on participation in project planning. The study also recommends the need to develop a guiding policy document detailing the importance of stakeholder participation in road construction life cycle in order to curb any future misgivings in implementation of these important socio-economic projects.
推荐文章
Project软件在项目管理中的应用
Project软件
计划
进度
控制
The Road Not Taken中的象征主义及其艺术特征
罗伯特·弗罗斯特
The Road Not Taken
象征主义
艺术特征
内容分析
关键词云
关键词热度
相关文献总数  
(/次)
(/年)
文献信息
篇名 Stakeholder Participation in Project Planning: Prerequisite to Effective Completion of Urban Road Transport Infrastructure Projects in Kenya
来源期刊 房屋建造与规划研究(英文) 学科 经济
关键词 STAKEHOLDER Participation Project PLANNING BUDGETING Scope PLANNING Resource PLANNING
年,卷(期) 2020,(1) 所属期刊栏目
研究方向 页码范围 73-91
页数 19页 分类号 F42
字数 语种
DOI
五维指标
传播情况
(/次)
(/年)
引文网络
引文网络
二级参考文献  (0)
共引文献  (0)
参考文献  (0)
节点文献
引证文献  (0)
同被引文献  (0)
二级引证文献  (0)
2020(0)
  • 参考文献(0)
  • 二级参考文献(0)
  • 引证文献(0)
  • 二级引证文献(0)
研究主题发展历程
节点文献
STAKEHOLDER
Participation
Project
PLANNING
BUDGETING
Scope
PLANNING
Resource
PLANNING
研究起点
研究来源
研究分支
研究去脉
引文网络交叉学科
相关学者/机构
期刊影响力
房屋建造与规划研究(英文)
季刊
2328-4889
武汉市江夏区汤逊湖北路38号光谷总部空间
出版文献量(篇)
127
总下载数(次)
0
总被引数(次)
0
论文1v1指导