A series of gas inrush events occurred during development at Grosvenor Mine resulting in exposure to elevated levels of methane at the production face. A total of 22 gas inrush events occurred, with between 15 and 130 m3 of methane released during each event. The presence of an undrained seam in the imme-diate floor, geotechnical characteristics of the floor, and the stress environment all contributed to these dynamic floor events, while the geological characteristics of the seam below, such as the seam thickness and ash content of 75%, prevented effective predrainage. However, events only occurred in headings mined parallel to the principal horizontal stress direction. In cut-throughs (C/T) perpendicular to the principal stress direction no events occurred, and higher methane levels were observed at the production face. The solution to preventing the gas inrush events involved creating a conduit in the interburden between the mined seam and the seam in the immediate floor to allow the gas to be drained during the development of the headings, as occurred in the cut-throughs (cut-through and cross-cut are regional terms that are analogous). A series of underground inseam (UIS) holes were drilled using the directional drill rig with the aim of fracturing this interburden ahead of the face and promote floor failure to allow the gas to release consistently. The floor fracturing was conducted using water pressure generated from a longwall salvage pump, with the current UIS drilling equipment retrofitted with a series of subs, packers and a fracturing tool. The packers and the fracturing tool were shifted to desired locations along the drilled UIS borehole to achieve the required fracture. The fractures were monitored using a proving hole and with a HYDAC data logger attached to the salvage pack, with the results analysed on the surface to ensure connectivity to the working seam.
推荐文章
Determination of brominated diphenyl ethers in atmospheric particulate matter using selective pressu
Brominated diphenyl ethers
Atmospheric particulate matters
Selective pressurised liquid extraction
Gas chromatography-mass spectrometry
基于Cross-Validation的小波自适应去噪方法
小波变换
Cross-Validation
自适应滤波
闽值
Using Geomechanical Method to Predict Tectonic Fractures in Low-Permeability Sandstone Reservoirs
Low-permeability sandstone reservoir
Fracture parameters
Geomechanical method
内容分析
关键词云
关键词热度
相关文献总数  
(/次)
(/年)
文献信息
篇名 Proactive interburden fracturing using UIS drilling with validation monitoring
来源期刊 矿业科学技术学报(英文版) 学科
关键词
年,卷(期) 2021,(1) 所属期刊栏目
研究方向 页码范围 3-7
页数 5页 分类号
字数 语种 英文
DOI
五维指标
传播情况
(/次)
(/年)
引文网络
引文网络
二级参考文献  (0)
共引文献  (0)
参考文献  (0)
节点文献
引证文献  (0)
同被引文献  (0)
二级引证文献  (0)
2021(0)
  • 参考文献(0)
  • 二级参考文献(0)
  • 引证文献(0)
  • 二级引证文献(0)
引文网络交叉学科
相关学者/机构
期刊影响力
矿业科学技术学报(英文版)
双月刊
2095-2686
32-1827/TD
江苏省徐州市中国矿业大学内
eng
出版文献量(篇)
2485
总下载数(次)
0
总被引数(次)
17133
  • 期刊分类
  • 期刊(年)
  • 期刊(期)
  • 期刊推荐
论文1v1指导