<正> Considerable progress of the internal target system was achieved during the year 2002. The technical design of the system has been finished. All of the mechanical drawings including cluster target and polarized target have been finished. The manufacturing of the cluster target is now in progressing. According to the schedule, the cluster target should be manufactured before April 30, 2003. The acceptance test and separate