基本信息来源于合作网站,原文需代理用户跳转至来源网站获取       
摘要:
Due to effects of succession typhoons and heavy rainfall, central government often invests the funds within shortest time of contingency promptly after disaster occurring to handle the planning and design project of taking precautions against natural disaster. Because the time limit of design project operating so generally were planned without many detail investigations, it was necessary to probe into the project effect and reconstruction security behind constructed. In this study, we choose the Meizuolyu stream watershed in Taitung County of eastern Taiwan as the research area to realize the situation and effect of setting up the control work reconstructions by inspecting, surveying and according to hydrology analysis and topography measured, and combined to carry on hydrology mathematical calculations. We adopted HEC-RAS software to make hydrology mathematical calculations, used the result to examine whether the position of each construction was proper, and finally submitted the complete of mend suggestion. The study concluded that no matter how urgent governance was, application of appropriate scientific tools to checklist designed could avoid the mistakes of the generation.
推荐文章
Elemental characteristics and paleoenvironment reconstruction: a case study of the Triassic lacustri
Trace elements
Occurrence mode
Paleoenvironment
Zhangjiatan oil shale
Yanchang Formation
Ordos Basin
学前STREAM教育在中国:现状、问题及建议
STREAM教育
学前教育
学前STREAM教育
Spatial analysis of carbon storage density of mid-subtropical forests using geostatistics: a case st
Carbon storage density
Geostatistics
Mid-subtropical forests
Spatial autocorrelation
Spatial heterogeneity
内容分析
关键词云
关键词热度
相关文献总数  
(/次)
(/年)
文献信息
篇名 The Suitability of Typhoon Disaster Reconstruction Work Planning—A Case of Meizuolyu Stream in Taitung County
来源期刊 工程(英文)(1947-3931) 学科 医学
关键词 TYPHOON DISASTER Reconstruction HYDROLOGY Analysis
年,卷(期) 2015,(5) 所属期刊栏目
研究方向 页码范围 237-247
页数 11页 分类号 R73
字数 语种
DOI
五维指标
传播情况
(/次)
(/年)
引文网络
引文网络
二级参考文献  (0)
共引文献  (0)
参考文献  (0)
节点文献
引证文献  (0)
同被引文献  (0)
二级引证文献  (0)
2015(0)
  • 参考文献(0)
  • 二级参考文献(0)
  • 引证文献(0)
  • 二级引证文献(0)
研究主题发展历程
节点文献
TYPHOON
DISASTER
Reconstruction
HYDROLOGY
Analysis
研究起点
研究来源
研究分支
研究去脉
引文网络交叉学科
相关学者/机构
期刊影响力
工程(英文)(1947-3931)
月刊
1947-3931
武汉市江夏区汤逊湖北路38号光谷总部空间
出版文献量(篇)
367
总下载数(次)
1
总被引数(次)
0
论文1v1指导